Tag Archive: SealGuard II

  1. Tunnel Passing Through Fault Zone helped with Polyurethane Injection

    Leave a Comment

    The polyurethane grout, SealGuard II, was needed to mine forward in this tunnel.  The tunnel was in a fault zone, and all the voids were to be filled with concrete.  However, when injected, the concrete leaked out of the face.  To contain the concrete, polyurethane grout was injected to provide a buffer. SealGuard II reacts is about 3 seconds and produces a rigid foam (900 PSI compression strength).  With the concrete contained in its intended location, advancing was able to commence. SealGuard II is manufactured by SealGuard, Inc. and the grouting was performed by Sub-Technical, Inc.

     

     

     

  2. Water Leaking through Old Mine Core Hole Stopped with Polyurethane

    Leave a Comment

    This underground mine, which is 1,100 feet below the surface, mined into a core hole taken from the surface.  The core hole was dumping significant amounts of ground water into the mine.  To stop the water inflow, a high-pressure probe and polyurethane grout was implemented. Grouting contractor Sub-Technical, Inc. used their specially designed probe to insert into the core hole.  The probe contains a port where polyurethane can then be injected to permanently seal it off. The polyurethane used was SealGuard II, which is manufactured by SealGuard, Inc.  SealGuard II is a dual component polyurethane grout that reacts in about 3 seconds to produce a rigid foam.  The cured foam has a 900-psi compression strength.

  3. SealGuard II Polyurethane Grout Injection to Stop Water

    Comments Off on SealGuard II Polyurethane Grout Injection to Stop Water

    The seam on this dam tunnel was actively leaking water.  SealGuard II, a dual component polyurethane grout, was injected into the leak path to seal the water flow.  With just a drill, a dual component caulking gun, and some SealGuard II, a water leak of up to 50 gallons per minute can be stopped.  SealGuard II is manufactured by SealGuard, Inc. and the grouting was performed by Sub-Technical, Inc.

  4. Water Traveling Along a De-Watering Pipe in a Hard Rock Mine

    Comments Off on Water Traveling Along a De-Watering Pipe in a Hard Rock Mine

     

    The picture on the left is water traveling down the outside of de-watering pipe in a hard rock mine.  The picture on the right is after the annulus of the pipe was injected with polyurethane grout to control the unwanted groundwater infiltration.  This high-pressure injection of grout was able to stop the water in about fifteen minutes.  The polyurethane grout used was SealGuard II, dual component material that reacts in 1-3 seconds to create a rigid foam.  SealGuard II is manufactured by SealGuard, Inc. and the injection was performed by Sub-Technical, Inc.