Sealguard II Leak Sealing Instructions
Step 1
Slide B (Nut) over A (mixer) - thread end first
Step 2
Drill 5/8" diameter hole to intersect leak path
Step 3
Tap A + B into hole until snug.
Prepare gun by pulling back plungers on E(dual caulk gun),insert D (tubes), while holding vertical, remove C from threaded end of tubes.
Step 4
Quickly align threads on D (tubes) with B (but) and tighten secure.
Step 5
Pump gun vigorously to expel grout to refusal or seal. If grout is washing out either pump slower or stop pumping and watch grout until it reacts halfway down A (mixer) then quickly give a pump to expel and repeat.
Tubes (D) must be 700 F or warmer - Place in hot water to heat.
Related Files | |
![]() |
Roof Bolt Grouting |
![]() | |
![]() |
Sealguard II Instructions |
![]() | |
Back to Technical Information
866-625-4550 |
















